Experimental Campaign Design

EasyWall (COMPETE2030) - Master Navigation Hub

Project Schedule

Interactive 36-month master Gantt chart spanning April 2025 to March 2028. Monitor structural, experimental, and numerical work package sequences.

Phase 2: Material Mechanics

Constitutive level testing: EPS properties, Concrete fresh/hardened states, and Steel/GFRP reinforcement characterization.

Phase 3: Sub-Assemblies

Meso-scale testing: Diagonal tension (racking), Vierendeel compliance, and wall-to-foundation connection integrity.

Phase 4: Full-Scale Testing

Macro-scale structural validation: Monotonic axial compression, out-of-plane flexure, and in-plane reversed cyclic loading.

Phase 5: Dynamic Shaking Table Testing

3D Shaking table prototype testing focused on torsional coupling, shear lag, and seismic vulnerability.

Live Campaign Tracker

Real-time laboratory follow-up system. Monitor specimen fabrication, curing schedules, and completed test data.

EPSB-RC Analytical Framework

Design and analysis tool for EPS/RC sandwich panels. Perform limit state verification, composite action estimation, and cross-sectional capacity analysis.